Completed Projects
Tom Hession Phase II
Completed: November 13, 2025
Department: City of Shelbyville Engineering
Location: This phase extends Tom Hession Drive from its current intersection at 300 North south to 200 North (Walser Road).
Project Lead: HIS & Runnebohm Construction
Scope: Second phase of commercial road infrastructure expansion project
Tom Hession Drive Phase II is a key infrastructure expansion project aimed at improving connectivity and supporting future industrial growth in Shelbyville. This phase extends Tom Hession Drive from its current intersection at 300 North south to 200 North (Walser Road). The project provides critical access to new developments, enhance traffic flow, support economic development, and aligns with the city’s long-term infrastructure improvement strategy. Tom Hession Phase III is in the design phase.
McKay Road & Miller Street Roundabout
Completed: July 27, 2025
Department: City of Shelbyville Engineering
Location: McKay Road and Miller Street Intersection
Closure Dates: May 27 – July 27, 2025
Project Lead: INDOT
Scope: Complete reconstruction of intersection from 4-way stop to a roundabout
The City of Shelbyville received a $2.4 million grant from INDOT for intersection improvements at Miller St and McKay Rd. The intersection has been identified for traffic and safety improvements since the 2010 Comprehensive Plan. This intersection is located in close proximity to the Shelbyville High School and Shelbyville Middle School campus which cause congestion issues during the time periods when students are arriving to and departing from the schools.
A third-party traffic study of the intersection concluded that a roundabout was the best solution to the existing traffic issues.
CSX Construction and Road Closure 
Completed: June 7, 2025
Department: City of Shelbyville Engineering
Location: North Riley Highway (between Boggstown Road and Michigan Road/Knauf Drive)
Closure Dates: May 27 – June 8, 2025
Project Lead: CSX Transportation
Scope: Complete reconstruction of the rail crossing and roadway approaches
North Riley Bridge Deck Repairs
- Completed: June 6, 2025
- Location: North Riley Bridge (adjacent to the CSX crossing)
- Project Lead: City of Shelbyville Engineering
Scope: Structural maintenance and deck resurfacing
Southwest Connector Trail
The City of Shelbyville received a $1,719,960 Next Level Trails Grant from the DNR to help extend the city’s trail system. This Trail will start where the blue river trail ends on the west side of the city and run south where it will Cross SR 44 and traverse through the high school and middle school properties to the new Miller and McKay Roundabout. From the Roundabout the trail will run east along McKay road until it reaches the old railroad corridor at which point it will run north to the Meridian Park Aquatic center. This Project is currently under design and planned for construction years 2024.
McKay Road Overlay
The McKay Road Overlay Project in Shelbyville, Indiana, was a major road resurfacing and infrastructure improvement effort completed in August 2024. Unlike typical city overlay projects, this initiative included the installation of 2,100 feet of storm sewer along the south side of McKay Road to improve drainage and reduce water-related roadway issues. Additionally, crews milled the existing concrete surface and applied a new layer of asphalt, creating a smoother and more durable driving surface. While the project caused temporary traffic disruptions, the improvements significantly enhanced the road’s safety, functionality, and appearance for motorists and residents.
City of Shelbyville Road Overlays
City of Shelbyville's Street Department annually schedules road overlays to maintain and extend the lifespan of streets without the cost and disruption of a full reconstruction. An overlay involves applying a new layer of asphalt over the existing roadway, which helps to:
- Improve Road Conditions – Smooths out cracks, potholes, and surface wear for a safer and more comfortable drive.
- Extend Road Life – Protects the underlying pavement structure, delaying the need for costly full-depth repairs.
- Enhance Safety – Provides better traction and visibility, reducing the risk of accidents.
- Cost-Effective Maintenance – More affordable and quicker than complete road reconstruction.
- Improve Drainage – Helps prevent water from seeping into cracks, which can cause further damage over time.
- Enhance Aesthetics – Gives roads a fresh, clean look that improves the overall appearance of the city.
Below find a list of our most recent municipality overlays:
2024 Overlays
Elliot Street
from Washington St to River Rd
Jackson Street
from Noble St to Vine St
Jackson Street
from Harrison St to Pike St
Knightstown Road
from Morris Ave to school
Maple Street
from Washington St to Franklin St
Montgomery Street
from Hodell St to Washington St
Morris Ave
from Vine St to Fair Ave
Noble Street
from Mechanic St to Broadway St
Pike Street
from Washington St to RR
Progress Parkway
from Michigan Rd to Twelve Oaks Drive
Walker Street
from Harrison St to RR
2023 Overlays
McKinley Street
from Meridian St to Harrison St
South Street
from Miller Ave to West St
West Street
from Colescott St to Evans St
Washington Street
from Ohio St to Frances Dr
Fifth Street
from Shelby St to West St
Elm Street
from Colescott St to McKinley Sy
James Street
from Morris Ave to turn in street
Ash Lane
from McKinley St to McNay Ln
Highpointe Boulevard
from Amos Rd to 165' N of Ellington Dr
Eastpointe Drive
from Highpointe Blvd 370' south
Westpointe Drive
from Highpointe Blvd to Flora Dr
Indiana Avenue
from McLane St to East Dr
Pennsylvania Street
from Harrison St to Conrey St
Haymond Street
from SR 9 to dead end
McNay Lane
from McKinley St to Grissom Ln
Gordon Street
from Harrison St to Noble St
East Drive
from Washington St to Jackson St
Southern Trace Boulevard
from Charlotte Way to 180' N of Savannah Blvd
Savannah Boulevard
from west cul-du-sac to 475' east
Charlotte Way
from west cul-du-sac to east cul-du-sac
Loper Drive
from Amos Rd to Drake Dr
Frank Street
from Morris Ave to Fair Ave
Worth St
from South St to Hendricks St
McKay Road
from SR 9 to Culbertson Rd
Cheney Avenue
from West St to Meridian St
First Street
from State St to Miller St
Hoover Street
from West St to Meridian St
Clayton Street
from West St to Meridian St
Mechanic Street
from Harrison St to Tompkins St
Hascauster Lane
from Harrison St to Norristown Ln
Stephens Drive
from Washington St to dead end
Norristown Place
from McKinley St to Hascauster Ln
2022 Overlays
4th Street
from Lincoln St to Quesada St
Conrey Street
from River Rd to alley
Conrey Street
from Washington St to Mechanic St
Doran Avenue
from Miller St to Meridian St
Eastern Avenue
from SR 44 to end
Elm Street
from Colescott St to South St
Jackson Street
from McLane St to Frances St
Lakeside Court
from Culbertson Rd to end
Lockerbie Road
from SR 9 to McKay Rd
Locust Street
from Miller Ave to West St
Meridian Street
from Evans St to Cheney Ave
Morrison Park Drive
from Shelby St to northeast turn
Noble Street
from Pennsylvania St to Mechanic St
Parker Avenue
from Parker Ave to south dead end
Pennsylvania Street
from Harrison St to RR
Poe Street
from Franklin St to LaBelle Ave
Revello Street
from Parker Ave to Alpine Ave
River Road
from Habig St to Tompkins St
Shelby Street
from Doran Ave to Ninth St
Shelby Street
from Hoover Ave to Seventh St
Teal Street
from Quesada St to Miller St
Third Street
from State St to Miller St
Third Street
from Harrison St to dead end
Tom Van Arden Drive
from Lockerbie Rd to Lockerbie Rd
Tompkins Street
from Colescott St to Evans St
Victor Place
from Franklin St to Elliott St
West Street
from Doran Ave to Evans St
-
Tyler Comstock
City Engineer
-